| 所在主题: | |
| 文件名: Quantitative_Cost_and_Schedule_Risk_Analysis_of_Nuclear_Waste_Storage.pdf | |
| 资料下载链接地址: https://bbs.pinggu.org/a-3705192.html | |
| 附件大小: | |
|
英文标题:
《Quantitative Cost and Schedule Risk Analysis of Nuclear Waste Storage》 --- 作者: Alexander Budzier, Bent Flyvbjerg, Andi Garavaglia, and Andreas Leed --- 最新提交年份: 2019 --- 英文摘要: This study provides an independent, outside-in estimate of the cost and schedule risks of nuclear waste storage projects. Based on a reference class of 216 past, comparable projects, risk of cost overrun was found to be 202% or less, with 80% certainty, i.e., 20% risk of an overrun above 202%. Based on a reference class of 200 past, comparable projects, risk of schedule overrun was found to be 104% or less, with 80% certainty, i.e., 20% risk of overrun above 104%. Cost risk and schedule risk are both substantial for nuclear waste storage projects. --- 中文摘要: 本研究为核废物贮存项目的成本和进度风险提供了一个独立的、由外而内的估计。根据216个过去可比项目的参考类别,发现成本超支风险为202%或以下,80%的确定性,即超过202%的超支风险为20%。根据200个过去可比项目的参考类别,发现进度超限风险为104%或以下,80%的确定性,即超过104%的风险为20%。对于核废物贮存项目而言,成本风险和进度风险都是巨大的。 --- 分类信息: 一级分类:Quantitative Finance 数量金融学 二级分类:General Finance 一般财务 分类描述:Development of general quantitative methodologies with applications in finance 通用定量方法的发展及其在金融中的应用 -- --- PDF下载: --> |
|
熟悉论坛请点击新手指南
|
|
| 下载说明 | |
|
1、论坛支持迅雷和网际快车等p2p多线程软件下载,请在上面选择下载通道单击右健下载即可。 2、论坛会定期自动批量更新下载地址,所以请不要浪费时间盗链论坛资源,盗链地址会很快失效。 3、本站为非盈利性质的学术交流网站,鼓励和保护原创作品,拒绝未经版权人许可的上传行为。本站如接到版权人发出的合格侵权通知,将积极的采取必要措施;同时,本站也将在技术手段和能力范围内,履行版权保护的注意义务。 (如有侵权,欢迎举报) |
|
京ICP备16021002号-2 京B2-20170662号
京公网安备 11010802022788号
论坛法律顾问:王进律师
知识产权保护声明
免责及隐私声明