楼主: tracy_shile
886 0

[经济] 我做的对吗? [推广有奖]

  • 0关注
  • 0粉丝

初中生

47%

还不是VIP/贵宾

-

威望
0
论坛币
28 个
通用积分
0
学术水平
0 点
热心指数
0 点
信用等级
0 点
经验
114 点
帖子
12
精华
0
在线时间
10 小时
注册时间
2009-2-24
最后登录
2010-1-27

楼主
tracy_shile 发表于 2009-9-20 03:42:39 |AI写论文

+2 论坛币
k人 参与回答

经管之家送您一份

应届毕业生专属福利!

求职就业群
赵安豆老师微信:zhaoandou666

经管之家联合CDA

送您一个全额奖学金名额~ !

感谢您参与论坛问题回答

经管之家送您两个论坛币!

+2 论坛币
请问我第二问做的对吗?不对的话,正确的做法是什么呢?
An owner of a small firm needs to hire some managers. Assume that each manager has time to do only one task. Task A is worth $100,000 to the owner. Task B is worth $75,000 and Task C is worth $50,000. The owner hires only two managers, having one do Task A and the other do Task B. What is the opportunity cost of Task B?
In the above problem, assume the firm still has only two managers. Assume further that each manager can do the other’s task with the same efficiency. What is the value of the second manager (i.e. what would the firm lose if it fired [and did not replace] the second manager)? What is the value of the first manager (when the second is still employed)?
a. The opportunity cost of Task B=$100,000/$75,000=4/3 task A

b. Assume the efficiency of the first manager on doing task A is X, and the efficiency of the second manager on doing task B is Y.
The value of the second manager=(X+Y)/Y
The
value of the first manager (when the second is still employed)=Y/X


二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

关键词:Opportunity EFFICIENCY managers employed Manager further manager problem having

您需要登录后才可以回帖 登录 | 我要注册

本版微信群
jg-xs1
拉您进交流群
GMT+8, 2025-12-31 22:07