楼主: MEI眼泪
1993 0

[学科前沿] SUPPLY CHAIN SCHEDULING- aeesmbly systems [推广有奖]

VIP

⿴资料王

已卖:58174份资源

巨擘

0%

还不是VIP/贵宾

-

威望
2
论坛币
725808 个
通用积分
206.2363
学术水平
125 点
热心指数
235 点
信用等级
112 点
经验
67229 点
帖子
13397
精华
0
在线时间
5 小时
注册时间
2007-3-2
最后登录
2016-8-9

楼主
MEI眼泪 发表于 2007-9-25 07:33:00 |AI写论文

+2 论坛币
k人 参与回答

经管之家送您一份

应届毕业生专属福利!

求职就业群
赵安豆老师微信:zhaoandou666

经管之家联合CDA

送您一个全额奖学金名额~ !

感谢您参与论坛问题回答

经管之家送您两个论坛币!

+2 论坛币
<P>SUPPLY CHAIN SCHEDULING- aeesmbly systems<BR><BR>Abstract<BR>We study conflict and cooperation issues in supply chain manufacturing. Consider an assembly<BR>system where suppliers provide parts to a manufacturer. A product cannot be delivered until all its<BR>parts have been supplied. The manufacturer performs nonbottleneck operations, for example outsourced<BR>assembly, packaging and delivery, for each product. Two classical scheduling objectives are considered:<BR>minimization of the total completion time and of the maximum lateness. We analyze how far from<BR>optimal the best schedule for a suppliers’ scheduling problem can be for the corresponding manufacturer’s<BR>problem, and vice versa. To resolve these conflicts, we consider four alternative assumptions<BR>about the relative bargaining power of the suppliers and the manufacturer, and in each case describe<BR>a practical mechanism for cooperation between the decision makers. Specifying the optimal strategies<BR>implied by these mechanisms requires the solution of various scheduling problems by the suppliers, the<BR>manufacturer and the overall system. For all these scheduling problems, we provide either an efficient<BR>algorithm or a proof of intractability. Moreover, for two problems that we show are intractable, we describe<BR>heuristics and analyze their worst case performance or demonstrate asymptotic optimality of their<BR>solutions. We demonstrate computationally that the cost saving realized by cooperation between the<BR>decision makers is significant in many cases. Extensions of our models to consider bottleneck operations<BR>at the manufacturer and transportation times are also developed.<BR>Key Words and Phrases: supply chain scheduling, cooperation in decision making, polynomial time<BR>algorithm, heuristic. 157606.zip (292.7 KB) 本附件包括:
  • SUPPLY CHAIN SCHEDULING- aeesmbly systems.pdf
<BR></P>
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

关键词:Supply Chain Scheduling aeesmbly Systems Supply suppliers conflict supplied systems example

您需要登录后才可以回帖 登录 | 我要注册

本版微信群
jg-xs1
拉您进交流群
GMT+8, 2026-1-9 04:33