楼主: xyhello
1526 3

[感谢]求助文献几篇 [推广有奖]

  • 0关注
  • 0粉丝

已卖:58份资源

本科生

48%

还不是VIP/贵宾

-

威望
0
论坛币
0 个
通用积分
0.1200
学术水平
4 点
热心指数
5 点
信用等级
4 点
经验
1180 点
帖子
56
精华
0
在线时间
40 小时
注册时间
2008-8-12
最后登录
2016-5-5

楼主
xyhello 发表于 2010-3-25 23:05:42 |AI写论文

+2 论坛币
k人 参与回答

经管之家送您一份

应届毕业生专属福利!

求职就业群
赵安豆老师微信:zhaoandou666

经管之家联合CDA

送您一个全额奖学金名额~ !

感谢您参与论坛问题回答

经管之家送您两个论坛币!

+2 论坛币
1、  1、Study on model of interruptible load to participate in reserve market
Wang, Jian
(College of Electric Power Engineering, SCUT South China University of Technology, Guangzhou, China); He, Yi Source: 2009 Asia-Pacific Power and Energy Engineering Conference, APPEEC 2009 - Proceedings, 2009, 2009 Asia-Pacific Power and Energy Engineering Conference, APPEEC 2009 – Proceedings
2、 2、 Study on incentive interruptible load contract with risk preference of power companies
Qi, Quan
(Key Laboratory of Power Station Automation Technology, Department of Automation, Shanghai University, Shanghai, China); Li, Xue; Li, Yuzeng Source: 3rd International Conference on Deregulation and Restructuring and Power Technologies, DRPT 2008, p 587-591, 2008, 3rd International Conference on Deregulation and Restructuring and Power Technologies, DRPT 2008
3、  3、Model of interruptible load contract for minimum compensation cost
Zhang, Youbing
(Zhejiang University of Technology); Chen, Wei; Gao, Qiang; Liu, Zhijian; Cao, Yijia Source: Proceedings of the Universities Power Engineering Conference, 2008, 2008 Proceedings of the 43rd International Universities Power Engineering Conference, UPEC 2008 Language: English
4、  4、Optimization model of purchasing interruptible load for network congestion restricted dispatch during the peak load time periods
Yu, Na
(Department of Electrical Engineering, Harbin Institute of Technology, Harbin 150001, China); Yu, Ji-Lai; Wang, Cheng-Min Source: Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, v 43, n 11, p 1818-1822, November 2009 Language: Chinese

5、



Research on power supply and demand side risk management: Options analyses on the interruptible load and risk insurance contract
Fang, Jun
(Department of Economie Management, School of Business Management, North China Electric Power University (NCEPU), Baoding, China); Wang, Haifeng Source: 2008 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2008, 2008, 2008 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2008


二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

关键词:求助文献 Deregulation Technologies Universities Compensation 求助 文献

沙发
cecilyzhang 发表于 2010-3-25 23:35:10

藤椅
cecilyzhang 发表于 2010-3-25 23:38:44
1# xyhello

第三篇。。 第五篇

Model of interruptible load contract for minimum compensation cost.pdf

171.73 KB

abbr_5073d91677f1f35ddfb581308d585010.pdf

237.3 KB

已有 1 人评分热心指数 收起 理由
xyhello + 1 谢谢

总评分: 热心指数 + 1   查看全部评分

板凳
cduqhz 发表于 2010-3-25 23:42:18
1、  1、Study on model of interruptible load to participate in reserve market

no1.pdf

211.25 KB

已有 1 人评分热心指数 收起 理由
xyhello + 1 th

总评分: 热心指数 + 1   查看全部评分

您需要登录后才可以回帖 登录 | 我要注册

本版微信群
jg-xs1
拉您进交流群
GMT+8, 2025-12-30 03:06