楼主: Toyotomi
1265 1

[项目管理] Project Management with Dynamic Scheduling Baseline Scheduling, Risk Analysis an [推广有奖]

贵宾

大师

1%

还不是VIP/贵宾

-

TA的文库  其他...

商学院英文书籍

威望
3
论坛币
492811 个
通用积分
66.5633
学术水平
1058 点
热心指数
1455 点
信用等级
1031 点
经验
127830 点
帖子
6622
精华
5
在线时间
2849 小时
注册时间
2009-12-29
最后登录
2022-3-11

初级热心勋章 初级学术勋章 初级信用勋章 中级热心勋章 中级学术勋章 高级热心勋章 高级学术勋章 中级信用勋章 特级热心勋章 高级信用勋章 特级学术勋章

相似文件 换一批

+2 论坛币
k人 参与回答

经管之家送您一份

应届毕业生专属福利!

求职就业群
赵安豆老师微信:zhaoandou666

经管之家联合CDA

送您一个全额奖学金名额~ !

感谢您参与论坛问题回答

经管之家送您两个论坛币!

+2 论坛币
2012
Project Management with Dynamic SchedulingBaseline Scheduling, Risk Analysis and Project Control
Project Management with Dynamic Scheduling Baseline Scheduling, Risk Analysis an

Authors:
ISBN: 978-3-642-25174-0 (Print) 978-3-642-25175-7  (Online)

Baseline Scheduling, Risk Analysis and Project Control

Vanhoucke, Mario

2012, XVIII, 310 p. 123 illus.

(gross) price
ISBN 978-3-642-25175-7

  Immediately available per PDF-download (no DRM, watermarked)


About this textbook
  • Overview of project scheduling principles available in literature
  •                                         Integration of scheduling, risk and control
  •                                         Use of software stimulated (student version available)
  •                                         Topics based on many research projects and reallife projects
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Leuven Gent Management School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves.

Project Management with Dynamic Scheduling.pdf (5.07 MB, 需要: 5 个论坛币)





二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

关键词:Scheduling Management Managemen Baseline Analysis Risk Analysis an

已有 1 人评分学术水平 热心指数 信用等级 收起 理由
bugbugbu + 1 + 1 + 1 精彩帖子

总评分: 学术水平 + 1  热心指数 + 1  信用等级 + 1   查看全部评分

本帖被以下文库推荐

I am looking for a talent scout who may appreciate me...

>>>>>>>生产和运营管理<<<<<<<
沙发
kexinkeqing 发表于 2013-10-22 09:41:02 |只看作者 |坛友微信交流群
kankan

使用道具

您需要登录后才可以回帖 登录 | 我要注册

本版微信群
加JingGuanBbs
拉您进交流群

京ICP备16021002-2号 京B2-20170662号 京公网安备 11010802022788号 论坛法律顾问:王进律师 知识产权保护声明   免责及隐私声明

GMT+8, 2024-5-8 10:23