tag 标签: 术语经管大学堂:名校名师名课

相关帖子

版块 作者 回复/查看 最后发表
基数限制和名词性推理的复杂性 在表达描述逻辑中 外文文献专区 nandehutu2022 2022-3-8 0 346 nandehutu2022 2022-3-8 18:47:00
经济学术语英文解释(对考研复试很有用) attachment 经管在职研 thanksalot 2009-3-30 12 4550 湘江之水 2020-4-14 09:57:08
[分享][下载][转帖]经济学术语大全 attachment 微观经济学 willgcw 2007-12-9 461 32752 GX_ 2020-4-11 19:10:06
常用的统计学术语中英文对照,实用版 attachment 计量经济学与统计软件 s04085590 2005-11-21 28 12014 cass100 2013-9-9 09:45:32
[求助](non-dominated)请教有关卫生经济英文术语的翻译问题 卫生经济学 rabbitsang 2008-3-8 2 3971 valenjxj 2011-11-7 18:17:46
英汉对照计量经济学术语 attachment 计量经济学与统计软件 风之王 2005-11-15 0 3631 风之王 2011-10-11 10:00:48
期货交易常用术语 attachment 金融学(理论版) simonkey 2005-11-10 1 2035 zheric 2011-10-11 07:55:08
[下载]@所有的物流术语@物流必备!! attachment 运营管理(物流与供应链管理) liangpei716 2009-6-2 1 1568 liangpei716 2010-9-21 13:51:47
《2000年国际贸易术语解释通则》下载 attachment 世界经济与国际贸易 ggh8608 2009-6-15 14 4273 648305056 2010-4-3 07:56:41
仓储专业术语 attachment 世界经济与国际贸易 1351533 2008-2-9 1 2289 8897335 2009-11-30 12:03:44
[下载][分享]金融新语·术语·俗语辞典(pdg) attachment 金融学(理论版) yinshun 2009-6-12 1 2628 swchotheart 2009-6-12 10:33:00
[分享][原创][分享]经济学的一些是术语 attachment 微观经济学 北方的新雨 2009-6-7 0 2151 北方的新雨 2009-6-7 11:01:00
[求助]信度分析结果的几个汉语术语翻译成英文 SPSS论坛 油麦菜 2009-4-24 5 8794 zuowen340 2009-4-27 14:01:00
经济金融术语汉英对照表 attachment 金融学(理论版) xiangjiao 2009-4-23 3 1393 liengang1986 2009-4-23 15:08:00
求几个经济学中英文术语的翻译(翻译一个送10金币) 微观经济学 wangzt 2009-2-22 6 3401 flsky 2009-3-3 20:19:00
财会常用术语(中英对照) attachment 会计与财务管理 riversmall 2008-10-1 25 14797 kiki101400 2009-1-2 12:49:00
一个税收上的术语翻译,小问题,有奖励 公共经济学 wangzt 2008-11-17 3 3780 kitchen0298 2008-11-21 21:30:00
中华人民共和国物流标准术语 attachment 运营管理(物流与供应链管理) PRC12345 2008-10-23 2 2794 donliu 2008-11-21 14:11:00
哪位有实验经济学的相关术语的中英文对照? 行为经济学与实验经济学 lj2008309 2007-4-1 3 3838 chinois 2007-11-8 18:49:00
[求助]关于CFR术语下装运通知发出时间问题 外贸相关考试论坛 yangjunan 2007-8-26 3 11847 lzzhongliang 2007-9-13 16:53:00

相关日志

分享 房地产项目开发主要专用术语
cyh 2013-1-25 14:41
IMPORTANT TERMS/PROJECT DEVELOPMENT Setback/building line —requirement to construct building a specified number of feet (setback) from the right-of-way line or other landmark. This is to ensure conformity with adjacent buildings and/or provide clear visibility for pedestrians and/or motorists. Right-of-way line —area designated for a public street or alley that is dedicated for traffic, public use, utilities, etc. Public entities own this area and the general public has a right to use it. As a result, no improvements are generally allowed to be constructed on rights-of-way. Building-related terms: Footprint —the space/area included within the perimeter of a slab, wall, or exterior of a structure. It is the shape or outline of the primary building slab or foundation as it will be constructed on the site. Envelope —the total outside perimeter of a structure, including footprints and any exterior patios, mallways, landscaping, etc. Facade —the exterior, usually the main entrance of a structure; approval of facades may be required as a part of the preservation of a historically important building or because of unique architecture, etc. Bulk —a three-dimensional space within which height, width, footprint, and number of structures/elevations/shapes are viewed in total relative to the land area upon which it will sit to determine land use intensity. This is then evaluated by planners relative to other structures in the area to assess the potential for congestion, noise, etc., for the entire area. Building codes —refer to required materials and methods used to construct improvements within a jurisdiction. Adherence to these codes is enforced by inspections before a certificate of occupancy (CO) is issued. Permit —document executed by the director of planning authorizing the construction, restoration, alteration, repair, etc., of a structure and acknowledging that it conforms to requirements under the applicable zoning ordinance. Floor-to-area ratio (FAR) —one of the more important tools used by city planners to control size and activity (use) desired within a geographic area. It is usually calculated as gross building area divided by square footage of land area. For example, an FAR of 3- to -1 would, for one acre of land (43,560 sq. ft.), provide that a structure with a gross building area of 130,680 sq. ft. may be developed (3* 43,560= 130,680). Obviously, the greater the FAR allowed for a site, the larger the project that may be constructed on that site, and vice versa. Height restrictions —used to limit the vertical height of a structure to be constructed. Usually imposed by a zoning ordinance; however, also subject to FAA aircraft approach/landing requirements and FCC communication tower regulations. Suburban locations usually have lower restrictions than central business districts (CBDs), which usually allow both greater heights and FARs. Allowable use —user activities permitted in a zoning classification, such as florist, travel agency, insurance agency, etc. Usually based on SIC code classifications. Impact fees —charged by public entities to cover added public sector expenses expected to be caused by a development, such as added traffic control, transportation issues, drainage, etc. Incentive zoning —used by city planners to accomplish community goals simultaneously with private sector development. Examples include the public sector granting a developer additional FAR, height, density, etc., if a development includes multifamily housing or a public park. Inclusionary zoning —that part of a zoning ordinance that requires that a specified type of development be included in order to obtain a permit for that site. An example would be the requirement that low-income housing units be included in a multifamily housing development in order for a permit to be granted. Minimum lot size —per zoning classification. Examples include light industrial (usually no minimum), medium industrial (5 acres), heavy industrial (10 acres), single family residential (1/4 acre per lots), and multifamily (20 units to the acre, i.e., 240 units requires 12 acres). This is used to assure some separation between large-scale developments. Parking ratio —required number of parking spaces per square feet of gross building space or per number of apartment units. (e.g., one parking space per 1,000 sq. ft. of office space, or 1.5 spaces per apartment unit). Different ratios may apply to underground or elevated parking garages, surface parking, and shared parking (day-night) with other structures. Site plans —drawing done to scale depicting the placement relative to right-of-way lines and setbacks of structures, circulation, parking, buffers, major landscaping, etc., on a site. Elevations/renderings —may first be conceptual or preliminary, then working, then final drawings of the improvements (buildings, etc.) to be constructed on a site. Will usually accompany the site plan as a part of presentation materials used for permitting, zoning, and financings. Traffic counts —number of vehicle trips per hour past a specific site. Studies may be performed to ascertain the current traffic volume and the likely increase to be caused by a development. This study may be required as a part of an application for a permit, rezoning, or assessing impact fees by public entities. Encroachment —occurs when the construction of improvements extends over a property line on to an adjacent property. Property tax abatements —forgiveness of taxes for a specified number of years, which is used by city planners to attract development to certain locations. Examples would include property tax reductions for a hotel if constructed near a public convention center, sports facility, etc. Special sales tax districts —special sales tax imposed on retail activities in an area which is dedicated to be used to finance public improvements/streets, etc., in that area, or dedicated to pay interest on public bonds issued to construct facilities in the affected district. Land-to-value ratio —calculated as dollar value of land to total project value (including land) anticipated upon completion of project. Used as a benchmark to evaluate whether the ratio of land acquisition price relative to total project value is comparable to that of other projects in the market. Buffer/berm —construction of landscape/slope required to shield or block access, view, or noise from an adjacent property which may be a very different and/or nonconforming use. Density transfer or transfer of development rights (TDR) —allowed in some jurisdictions whereby one property owner can sell/transfer to another all or part of the development rights for his property, including allowable building height, density, and FAR, allowed under current zoning. This enables the acquiring entity more height and/or density for its development than what would otherwise be possible. Mixed use development —usually a combination of office, retail, and/or hotel in a project; may also include recreation, sports facilities, etc. Inverse condemnation —results of a development that affect the value of nearby/adjoining land uses. Examples: building an airport, dam, power stations, etc., in an area that affects property values to a greater/lesser degree but may or may not require condemnation of the entire area via eminent domain. Cumulative zoning —used in many jurisdictions to automatically allow lower density development than the maximum allowed under current zoning. For example, the most dense, noisy, etc., land use is usually heavy industrial zoning. Under cumulative zoning, land owners in an area zoned heavy industrial may develop less intrusive buildings, such as distribution centers, warehouses, etc., within the heavy industrial classification. Other examples would allow single family units (lower density) to be built within a multifamily zoning classification (higher density). However, more intrusive uses are not allowed in a less intrusive zoning classification (e.g., no multifamily development within an area zoned for a single family). Stacking plan —a floor-by-floor template or layout used to diagram how much space will be available for lease per floor in a building and to track the location and quantity of space currently leased to tenants.
个人分类: 房地产|25 次阅读|0 个评论

京ICP备16021002-2号 京B2-20170662号 京公网安备 11010802022788号 论坛法律顾问:王进律师 知识产权保护声明   免责及隐私声明

GMT+8, 2024-4-28 04:31