楼主: bigfoot0516
1512 0

[外行报告] 汇丰银行:全球贵金属行业经济研究报告2009年4月 [推广有奖]

已卖:1848份资源

学术权威

2%

还不是VIP/贵宾

-

威望
2
论坛币
11468949 个
通用积分
6.9596
学术水平
804 点
热心指数
577 点
信用等级
765 点
经验
54293 点
帖子
1764
精华
17
在线时间
452 小时
注册时间
2009-2-20
最后登录
2019-9-2

楼主
bigfoot0516 发表于 2009-7-16 14:47:10 |AI写论文

+2 论坛币
k人 参与回答

经管之家送您一份

应届毕业生专属福利!

求职就业群
赵安豆老师微信:zhaoandou666

经管之家联合CDA

送您一个全额奖学金名额~ !

感谢您参与论坛问题回答

经管之家送您两个论坛币!

+2 论坛币
Our analysis of 13 development-stage
projects indicates that the optimum gold
price for project development is on
average cUSD125/oz higher than the
price used in the feasibility studies
􀀗 The actual performance of the 13 projects
we analyzed in 2005 argues that the gold
price “cushion” to ensure against
unexpected technical, financial, and
permitting challenges is amply warranted
􀀗 We introduce a simple rule of thumb
measure based on all-in production costs
to estimate the optimum development
price without the need for option models
In August 2005, we valued 13 development-stage projects using
both the traditional NPV approach as well as a real option
model, based on the feasibility studies for each of the projects.
While option theory argues that an undeveloped deposit has
inherent value because it could be developed economically if
the commodity price increases sufficiently, it doesn’t say when
or if the deposit should be developed once the commodity price
actually rises. NPV analysis tells us whether the project is
economic (or not) on the basis of certain assumptions, but it
doesn’t tell us whether the project is more valuable in its
undeveloped state.
The commodity price at which the NPV and option values are
equal provides a point of indifference above which project
development begins to make sense in terms of both NPV
models and option theory. There is, moreover, a price at which
NPV is maximized relative to the option value – this is what we
define as the optimum commodity price for project
development. With the increase in industry input costs, we find
that the “cushion” required to “insulate” development-stage
projects against technical, financial, and political uncertainty
has increased. In this report, we also introduce a simple rule of
thumb measure to estimate the optimum development price
without the use of option models. The optimum price is
approximately twice the all-in cost (expressed as USD/oz)
minus 18% of the prevailing gold price.
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

关键词:汇丰银行 经济研究 研究报告 金属行业 贵金属 研究报告 行业 全球 汇丰银行 贵金属

h 贵金属 4.pdf
下载链接: https://bbs.pinggu.org/a-357283.html

426.36 KB

需要: 65535 个论坛币  [购买]

您需要登录后才可以回帖 登录 | 我要注册

本版微信群
jg-xs1
拉您进交流群
GMT+8, 2025-12-9 14:59