楼主: bigfoot0518
1418 1

[外行报告] 印度电力行业研究报告2009年1月 [推广有奖]

已卖:2563份资源

学术权威

70%

还不是VIP/贵宾

-

威望
10
论坛币
10441579 个
通用积分
7.0590
学术水平
1222 点
热心指数
923 点
信用等级
1220 点
经验
65985 点
帖子
2052
精华
21
在线时间
405 小时
注册时间
2008-12-11
最后登录
2021-8-16

楼主
bigfoot0518 发表于 2009-1-20 22:35:00 |AI写论文

+2 论坛币
k人 参与回答

经管之家送您一份

应届毕业生专属福利!

求职就业群
赵安豆老师微信:zhaoandou666

经管之家联合CDA

送您一个全额奖学金名额~ !

感谢您参与论坛问题回答

经管之家送您两个论坛币!

+2 论坛币

Contents
Page No.
Investment summary .......................................................................................3-5
11th plan capacity addition back-ended, risk of further slippages ..............6-10
Power generation YTD at 93% of target, PLF down 340bp YoY .................... 11
High base, peak deficits leading to increased power tariffs ......................12-14
Companies....................................................................................................15-33
NTPC .........................................................................................16
Tata Power .................................................................................23
Reliance Infrastructure .............................................................29
CESC..........................................................................................32
Private sector ...............................................................................................35-40
Adani Power ...............................................................................36
GMR Energy .............................................................................37
GVK Power & Infra. .................................................................37
Jaiprakash Power ......................................................................38
Jindal Power ...............................................................................39
KSK Energy...............................................................................39
Lanco Infratech .........................................................................40

11th plan capacity addition back-ended, risk of further slippages
Central Electricity Authority (CEA) has in its latest report (November, 2008) indicated
that capacity addition during April - November 2008 stood at 2,059MW, vs. target of
8,471MW, an achievement of just 24%. During the Eleventh Plan, capacity addition till
date stands at 11,322MW, vs target 25,256MW, an achievement of just 44%. This clearly
indicates significant delays in terms of project commissioning.
Given the delays, CEA has stated that the feasible capacity addition during FY09 stands at
7,530MW vs. targeted 11,061 MW, and for FY10 at 15,451MW from 18,034MW. The
entire reduction is due to delays in terms of commissioning of thermal power projects.
This has lead to a bunching up of capacity addition in FY12 at 28,733MW, representing
36% of the planned capacity in 11th plan.

NTPC, private players, etc likely to miss capacity addition targets
During FY09, CEA expects capacity addition of 1,500MW by NTPC and 2,761MW from
private players. During April - November 2008, actual capacity addition by NTPC and
private players have been 250MW each, and a large part of the targeted capacity additions
have now been pushed to December 2008/4QFY09. Thus, we believe that there could be
further delays in terms of capacity commissioning.
For NTPC, while the targeted capacity addition during Eleventh Plan stands at 22,430
MW, CEA expects projects under constructions like Barh I (660MW), Barh II (1,320
MW), Mauda Maharashtra (1,000 MW), and Nabinagar JV (250 MW), totaling to 3,230
MW to be delayed to the Twelfth plan. Thus, CEA expects capacity addition of only
15,440 MW for NTPC, during the Eleventh Plan (as 3,760MW of projects are yet to be
awarded). Also, as per CEA, Adani, TTPW and CESC have projects of 2,640MW,

2,900MW and 250MW under construction, to be commissioned in the Eleventh Plan. Of
this, 2,705MW is expected to be merchant, comprising of 640MW by Adani Power and
100MW by Tata Power (part of its 250MW expansion at Trombay), 1,000MW by Jindal
Power, 552MW by Lanco Infratech. This should add to earnings in a sizeable manner,
given the current power trading rates at Rs6-8/unit

287714.pdf (597.66 KB, 需要: 500 个论坛币)


[此贴子已经被作者于2009-1-20 22:42:06编辑过]

二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

关键词:行业研究报告 研究报告 行业研究 电力行业 Construction 研究报告 行业 印度 电力

沙发
gongwng(未真实交易用户) 发表于 2009-1-20 22:38:00
没人知道到底怎么样......需要中介

您需要登录后才可以回帖 登录 | 我要注册

本版微信群
jg-xs1
拉您进交流群
GMT+8, 2025-12-24 12:21