楼主: bigfoot0518
1205 0

[外行报告] 2010年3月美国光伏行业研究报告 [推广有奖]

已卖:2563份资源

学术权威

70%

还不是VIP/贵宾

-

威望
10
论坛币
10441579 个
通用积分
7.0590
学术水平
1222 点
热心指数
923 点
信用等级
1220 点
经验
65985 点
帖子
2052
精华
21
在线时间
405 小时
注册时间
2008-12-11
最后登录
2021-8-16

楼主
bigfoot0518 发表于 2010-3-18 10:38:28 |AI写论文

+2 论坛币
k人 参与回答

经管之家送您一份

应届毕业生专属福利!

求职就业群
赵安豆老师微信:zhaoandou666

经管之家联合CDA

送您一个全额奖学金名额~ !

感谢您参与论坛问题回答

经管之家送您两个论坛币!

+2 论坛币
【出版时间及名称】:2010年3月美国光伏行业研究报告
        【作者】:摩根大通
        【文件格式】:pdf
        【页数】:31
        【目录或简介】:
We are downgrading a handful of solar names within our Alternative Energy coverage
universe as we believe this industry faces a number of supply and margin headwinds
heading into C2H10. We believe these headwinds are likely to cause many solar stocks
to underperform what we feel are more attractive alternative energy investments in the
LED and Wind sectors which look to have better underlying fundamentals over the next
12 months.
• Solar Demand Strength Is The Highlight In C1H10 as demand pull-forward in
Germany is apt to drive an atypical seasonal pattern in C2010. Our updated global
solar demand model calls for ~7.5GWs of installations in C2010 with our work
suggesting ~4.5GWs of this coming in the first half of the year before Germany’s
tariff reset in July drives a moderation in demand growth in C2H10. As solar stocks
have historically traded in-line with volume demand, we view this as a particularly
negative indicator for the group.
• Oversupply Likely Becomes a Major Issue In C2H10 as checks continue to suggest
that module makers are aggressively expanding capacity to chase market share even as
many admit that supply could soon be running ahead of demand given how fast the
industry is adding. To us, this feels eerily similar to what happened to the industry in
C2H08-C1H09 when the market was oversupplied by as much as 30% for several
quarters. In fact, we estimate that C2H10 oversupply could approach 3-4GWs on an
annualized basis, even worse than what occurred in the prior inventory correction.
• We Think Module ASPs Will Contract 20% – If Not More – In C2H10. This
should drive big margin compression and add significant risk to C10/C11 estimates as
many module makers will largely be through the bulk of their poly cost reductions by
mid-year and scaling of non-silicon costs will likely only provide a partial offset.
• Right Around The Corner Is Yet Another Subsidy Cut. On Jan 1, 2011 Germany
is expected to make yet another subsidy cut, somewhere in the 10% range as part of
the annual regression plan. This should add even further downside pressure on product
demand and margins over the next 12 months. We say enough is enough, and
recommend long-only investors look elsewhere, to LED and Wind themes, for
investment ideas.
• Downgrading FSLR and ENER to Underweight and ESLR to Neutral;
reiterating ASTI (N), WFR (UW), and AMAT (OW). We encourage investors
looking for alternative energy exposure to look to fundamentally stronger segments
such as LED (CREE/VECO) and Wind (see separate BWEN initiation).
二维码

扫码加我 拉你入群

请注明:姓名-公司-职位

以便审核进群资格,未注明则拒绝

关键词:行业研究报告 研究报告 行业研究 光伏行业 historically 美国 研究报告 行业

j 美国光伏 3.pdf
下载链接: https://bbs.pinggu.org/a-573957.html

418.75 KB

需要: 10000 个论坛币  [购买]

已有 1 人评分学术水平 热心指数 信用等级 收起 理由
industrial -1 -1 -1 疯了!!!!!!

总评分: 学术水平 -1  热心指数 -1  信用等级 -1   查看全部评分

您需要登录后才可以回帖 登录 | 我要注册

本版微信群
jg-xs1
拉您进交流群
GMT+8, 2025-12-21 20:51