6kV±äµçËùÉè¼Æ_µçÆø¹¤³ÌÂÛÎÄ·¶ÎÄ_µçÆø¹¤³ÌÂÛÎÄ
·¢²¼Ê±¼ä£º
2014-12-01
À´Ô´£º
ÈË´ó¾¼ÃÂÛ̳
µçÆø¹¤³ÌÂÛÎÄ
Ŀ ¼
Õª ÒªII
AbstractIII
1 Ð÷ ÂÛ1
2 ²Î¿¼×ÊÁϼ°Æä·ÖÎö2
2£®1 Ôʼ×ÊÁÏ2
2.1.1³§ÇøƽÃæ²¼ÖÃͼ2
2.1.2¸ººÉ×ÊÁÏ3
2.1.3¹©µçÐÒé3
2.1.4¹©µçϵͳ¼¼ÊõÊý¾Ý3
2.1.5±¾³§¸ººÉÐÔÖÊ3
2.1.6±¾³§×ÔÈ»Ìõ¼þ3
2£®2 Éè¼Æ·¶Î§¡¢ÄÚÈݼ°Æä²½Öè4
3 È«³§¸ººÉͳ¼Æ5
3£®1 ¸ººÉ¼ÆËã5
3£®2 ÎÞ¹¦¹¦Âʲ¹³¥7
4 ¸÷×Ó±äµçËù±äѹÆ÷µÄÐͺŽøÐгõÑ¡9
5 Äⶨȫ³§Åäµçϵͳ²Ýͼ11
6 ¶Ì·µçÁ÷¼ÆËã12
6£®1 ¼ÆËã¶Ì·µçÁ÷µÄÄ¿µÄ12
6£®2 ¶Ì·µçÁ÷¼ÆËã12
6.2.1¼ÆËã·½·¨12
6.2.2¼ÆËã²½Öè12
7 ¸ßµÍѹÉ豸ѡÔñ17
7£®1 ¸ßѹÉ豸ѡÔñµÄÔÔò17
7.1.1¸ßѹ¿ª¹Ø¹ñµÄÑ¡ÔñÔÔò17
7.1.2¶Ì·УÑéµÄÔÔò17
7£®2 ¸÷²¿·Ö¸ßѹ¿ª¹Ø¹ñµÄÐͺÅÑ¡Ôñ17
7.2.1 6Kv²à¿ª¹Ø¹ñµÄÑ¡Ôñ17
7.2.2 ³µ¼ä±äµçËù³öÏß¿ª¹Ø¹ñµÄÑ¡Ôñ17
7.2.3 ±ÜÀ××°Öÿª¹Ø¹ñµÄÑ¡Ôñ17
7£®3±äµçËùÒ»´ÎÉ豸µÄÑ¡ÔñÓëУÑé18
7.3.1 380V²àÒ»´ÎÉ豸µÄÑ¡ÔñÓëУÑé18
7.3.2 6kV²àÒ»´ÎÉ豸µÄÑ¡ÔñÓëУÑé19
8 ¸ßµÍѹÏß·ѡÔñ20
8.1 Ïß·ѡÔñÓëУÑéµÄÏîÄ¿¼°Ìõ¼þ20
8.2 ¸ßµÍѹĸÏßÑ¡Ôñ20
8.3 6kV¸ßѹ³öÏßÏß·µÄÑ¡ÔñÓëУÑé20
8.3.1Ñ¡ÔñУÑéµÄ·½·¨20
8.3.2°´·¢ÈÈÌõ¼þÑ¡Ôñ6kV¸ßѹ³öÏß21
8.4 ¸÷³µ¼äÓõçÉ豸µ¼ÏßÑ¡Ôñ21
9 ¼Ìµç±£»¤ÉèÖÃ23
9.1 ³µ¼ä±äѹÆ÷µÄ¼Ìµç±£»¤×°ÖÃ23
9.2 6kVĸÏ߶Ï·Æ÷µÄ±£»¤24
9.3 6kV³öÏ߸÷֧·µÄ±£»¤24
9.4ÆäËü¸÷Ïß·±£»¤Õû¶¨¼ÆËã24
10 ·ÀÀ×Óë½ÓµØÉè¼Æ25
10.1 ±äµçËùµÄ·ÀÀ×±£»¤25
10.1.1 µçÁ¦Ïß·µÄ·ÀÀ×´ëÊ©25
10.1.2 ±äÅäµçËùµÄ·ÀÀ×´ëÊ©25
10.1.3 À×µçÇÖÈ벨µÄ·À»¤26
10.2 ±äµçËù¹«¹²½ÓµØ×°ÖõÄÉè¼Æ26
10.2.1 ½ÓµØµç×èµÄÒªÇó26
10.2.2 ½ÓµØ×°ÖõÄÉè¼Æ27
11 »æÖÆ×ܱäµçËù¹©µçϵͳȫͼ28
12 ×Ü ½á29
Ö л30
²Î¿¼ÎÄÏ×31
Õª Òª
±¾´ÎÉè¼ÆÖ÷ҪΧÈÆ×űäµçËùµÄµçÆøÉè¼ÆÕ¹¿ª£¬½áºÏÔʼ×ÊÁÏ£¬Íê³É±äµçËùÉè¼ÆµÄ¸÷¸ö²½Ö裬Ö÷Òª°üÀ¨£ºÈ«³§¸ººÉͳ¼Æ£»¸ßѹ½øÏßÑ¡Ôñ£»Ñ¡Ôñ³µ¼ä±äµçËù±äѹÆ÷̨Êý¼°ÆäÈÝÁ¿£»Äⶨȫ³§Åäµçϵͳ²Ýͼ£»¶Ì·µçÁ÷¼ÆË㣻¸ß¡¢µÍѹÅäµç×°ÖÃÑ¡Ôñ£»¸ß¡¢µÍѹ³öÏßÑ¡Ôñ£»¼Ìµç±£»¤×°ÖÃÉèÖü°ÆäÕû¶¨¼ÆË㣻·ÀÀ×Óë½ÓµØÉè¼Æ£»»æÖÆ×ܱäµçËù¹©µçϵͳȫͼ¡£±¾×ÅÒÔÈËΪ±¾µÄ×ÚÖ¼£¬×·Çó±äµçËùµÄÔËÐоßÓпɿ¿ÐÔ£¬°²È«ÐÔ£¬Áé»îÐÔ£¬¾¼ÃÐÔ¡£Í¨¹ý¶Ô¿ÎÌâµÄÍê³É£¬ÔÚÉè¼Æ¹ý³ÌÖÐÔö½ø¶Ô¹©µç¹¤³Ì£¬µçÁ¦ÏµÍ³¿Î³ÌµÄÀí½âºÍÕÆÎÕÔËÓ㬴ﵽÔÚʵ¼ùÖÐÍêÉÆ×ÔÎÒ£¬·á¸»ÖªÊ¶£¬¹®¹ÌרҵµÄÄ¿µÄ¡£
¹Ø¼ü´Ê 6kV±äµçËù£»µçÆøÉè¼Æ£»µçÆøÉ豸ѡÔñ£»¼Ìµç±£»¤
Abstract
The design mainly starts with the electrical design of electrical substation , combining with raw data, then complete the steps of substation design, including: full factory load statistics; high pressure into the line of choice; choose the number and capacity of substation transformers ; drawn sketch the whole plant distribution system; short-circuit current calculation; high and low voltage distribution equipment selection; high and low outlet options; protection devices to set their calculation; lightning protection and grounding; draw total electricity substation system-wide plan. In people-oriented objectives, the operation of substation requires reliability, security, flexibility and economy. Through the completion of the subject, to enhance the power supply works, power systems understanding and mastering the application of course in the process of design, to the practice of self-development, a wealth of knowledge, the purpose of consolidating the profession.
Keywords 6kVsubstation£»Electrical Design£»Electric Equipment Selection£»Relaying protection